We help the world growing since 2012

SHIJIAZHUANG TUOOU CONSTRUCTION MATERIALS TRADING CO., LTD.

DİFFERENCES BETWEEN PREFABRİCATED HOUSE AND STEEL HOUSE

DİFFERENCES BETWEEN PREFABRİCATED HOUSE AND STEEL HOUSE

The Differences Between Prefabricated Houses and Steel Houses Prefabricated houses: prefabricated houses are structures that provide the opportunity to quickly assemble all the building elements and wall panels in the factories, and shipped to the place where they will be installed.

Differences Between Prefabricated Houses and Steel Houses All carrier systems of prefabricated buildings are manufactured from high quality galvanized steel sheets in state-of-the-art rollform machines.

* Wall panels of prefabricated buildings are produced and shipped in factories.

*The assembly time of prefabricated buildings is six working days on average of one hundred square meters.

*It is possible to disassemble and reassemble prefabricated structures.

*Prefabricated structures have very low loss rates in disassembly and assembly processes, allowing reassembly.

Steel houses: Steel houses are made by forming cold galvanized steel in the latest technology rollform machines of carrier steel systems in factories. All galvanized steels used in steel houses are produced in different thicknesses as a result of appropriate static calculations. -The steel skeletons of the steel houses prepared in the factories are sent to the shipping address where they will be made in the form of carcasses, and as a result of assembling and combining the carcasses with each other according to the plan and project, the installation of the steel is carried out. And the steel frame of the building is made.

– Installation of steel houses on construction sites takes longer than prefabricated houses. The reason for this is that the steel carcasses are first assembled, the steel house takes the shape of the carcass, and then the steel surfaces are covered with OSB, and then the coating materials suitable for the exterior are covered, and the processes of putting insulation materials on the inside of the steel remaining in the building and coating the interior of the building are long-lasting. are among the reasons for driving.

-Steel structures are demountable structures, but dismantling is more difficult and more laborious than prefabricated structures.

– While the waste rate in prefabricated buildings is between five and ten percent, this rate of waste in steel houses is even higher.

-The installation time of steel houses for one-story one hundred square meters on average is twenty to twenty-five working days, including coatings.


Post time: Nov-14-2022